Astoria and Columbia River Railroad logo
Our Baldwin #21 at work
Baldwin #21
Tender
SP&S #273
Astoria RR
Work Photos
Early Photos
History
Events
Join
ARPA
Links
Contact Us
Home


Photo Journal

Surfacing the Stay Bolt Sleeves
The surfacing tool opened up to show it's construction


Surfacing the Stay Bolt Sleeves

Saturday, October 9, 2010 by MC

We built the tool specifically for this job. It screws onto the staybolt sleeves and the shaft is turned with a hand drill. The grindstone surfaces the face of the sleeve.

More Photo NEWS
 


railroad tracks
Astoria Railroad Preservation Association
P.O. Box 541
446 W. Marine Dr.
Astoria, Oregon 97103
(503) 325-5323
e-mail: info@astoriarailroad.org

An Educational Non-Profit Corporation
Dedicated to Promoting Public Awareness of Railroad History
Through the Preservation and Operation of Vintage Railway Equipment.


just a counter

design = cheth