|
|||||
Baldwin #21 Tender SP&S #273 Astoria RR Work Photos Early Photos History Events Join ARPA Links Contact Us Home |
|||||
| |||||
Tapping for Stay BoltsFriday, November 19, 2010 by MCOnce we had completed the riveting of the mud ring we began to tap and install the stay bolts. An air motor is used to turn the stay bolt tap to simultaneously cut threads in the boiler and firebox. The staybolt is then threaded in and the ends peened over. More Photo NEWS |
design =
cheth