Astoria and Columbia River Railroad logo
Our Baldwin #21 at work
Baldwin #21
Tender
SP&S #273
Astoria RR
Work Photos
Early Photos
History
Events
Join
ARPA
Links
Contact Us
Home


Photo Journal

Forging of crown staybolts
Although blurry (we need to find a steadier photographer), the 7/8" bar is heated to "yellow" hot in a water cooled induction coil. It takes 51 seconds! The coil is square copper tubing with cooling water flowing through it.


Forging of crown staybolts

Friday, June 28, 2013 by JN

We have been manufacturing new staybolts for the crown of the firebox in the boiler. The first step was preparation of the dies to be used in the forging. Next we cut lengths of 7/8 steel bar which were carried up to Portland for the ends to be forged. Here we see some shots of the forging process.

More Photo NEWS
 


railroad tracks
Astoria Railroad Preservation Association
P.O. Box 541
446 W. Marine Dr.
Astoria, Oregon 97103
(503) 325-5323
e-mail: info@astoriarailroad.org

An Educational Non-Profit Corporation
Dedicated to Promoting Public Awareness of Railroad History
Through the Preservation and Operation of Vintage Railway Equipment.


just a counter

design = cheth