|
|||||
Baldwin #21 Tender SP&S #273 Astoria RR Work Photos Early Photos History Events Join ARPA Links Contact Us Home |
|||||
| |||||
Installing Crown StaysSaturday, March 15, 2014We used the Mag Drill setup on a sloped platform to power the reamer cutting each of the tapered holes. We then inserted the tapered tap and turned it by hand, using 1/2 steel rods as handles thru the square shank between the drill and the tap. More Photo NEWS |
design =
cheth