|
|||||
Baldwin #21 Tender SP&S #273 Astoria RR Work Photos Early Photos History Events Join ARPA Links Contact Us Home |
|||||
| |||||
The final liftSunday, August 19, 2018 by MCAfter the shims had been clamped on the pedestals and the binders removed, the frame was picked up and lowered over the drive boxes. We set it on blocks straddling the axles so we can re-attach the binders, place the wedges and adjust the wheel spacing. More Photo NEWS |
design =
cheth