|
|||||
Baldwin #21 Tender SP&S #273 Astoria RR Work Photos Early Photos History Events Join ARPA Links Contact Us Home |
|||||
| |||||
Preparing for Smokebox RivetsSaturday, December 8, 2018 by MCThe new smokebox was temporarily installed with bolts in case the alignment needed to be tweaked when the boiler would be installed on the frame. Now that the boiler is on the frame the bolts will be replaced with rivets and the holes need to be enlarged to proper size. More Photo NEWS |
design =
cheth