|
|||||
Baldwin #21 Tender SP&S #273 Astoria RR Work Photos Early Photos History Events Join ARPA Links Contact Us Home |
|||||
| |||||
Priming various air linesSaturday, December 19, 2020 by MCOne of the ongoing tasks as we put the locomotive together is to pull out the many parts that have been stashed around the shop and getting them ready to install. All of the air lines (pipes) that are still intact have been cleaned and primed so they can be installed prior to final painting. Any missing or damaged pipes will have to be fabricated. More Photo NEWS |
design =
cheth