|
|||||
Baldwin #21 Tender SP&S #273 Astoria RR Work Photos Early Photos History Events Join ARPA Links Contact Us Home |
|||||
| |||||
Painting the DownpipesWednesday, August 21, 2024The fabrication of the downpipes has finally been completed. After we built the flanges, Stu cut and fit the individual pipe pieces. He tacked them together in place and then the final welds were completed in the shop on pipe stands. After several delays in the welding process they are finally ready to install and they got a fresh coat of "barbecue black" paint. More Photo NEWS |
design =
cheth