Astoria and Columbia River Railroad logo
Our Baldwin #21 at work
Baldwin #21
Tender
SP&S #273
Astoria RR
Work Photos
Early Photos
History
Events
Join
ARPA
Links
Contact Us
Home


Photo Journal

Half round added to combing edge
Half round bolted to combing edge prior to riveting.


Half round added to combing edge

Sunday, July 27, 2008 by mc

All of the tank structure is complete so it is time for the decorative touches. This half round is shaped to fit the combing edge and will be riveted in place. Sealant has been placed behind the half round and bolts hold it in position awaiting the rivets. They will come out one at a time and be replaced with rivets.

More Photo NEWS
 


railroad tracks
Astoria Railroad Preservation Association
P.O. Box 541
446 W. Marine Dr.
Astoria, Oregon 97103
(503) 325-5323
e-mail: info@astoriarailroad.org

An Educational Non-Profit Corporation
Dedicated to Promoting Public Awareness of Railroad History
Through the Preservation and Operation of Vintage Railway Equipment.


just a counter

design = cheth