Firebox is inside the Boiler
At the end of the day on January 9th the firebox just needs to go up the last 4 inches to be in place.


Firebox is inside the Boiler

Saturday, January 16, 2010 by MC

The weekend of January 9-10, 2010 marked another major step in the restoration of SMV 21. The entire boiler was raised up on cribbing so that the new firebox could be rolled under it. Once the boiler was back down to a managable height the firebox was then raised up into place. While most of this was done in one day, the final four inches or so took a while (and a lot of effort due to the tight fit of the mud ring) and the last little bit was finished on January 16th. (See photo sequence below for more details)

More Photo NEWS
 


railroad tracks
Astoria Railroad Preservation Association
P.O. Box 541
446 W. Marine Dr.
Astoria, Oregon 97103
(503) 325-5323
e-mail: info@astoriarailroad.org

An Educational Non-Profit Corporation
Dedicated to Promoting Public Awareness of Railroad History
Through the Preservation and Operation of Vintage Railway Equipment.


just a counter

design = cheth